Frequently Asked Questions

Will the beads settle after a while?
No, the beads are held together with resin and form a solid structure.

I’ve read somewhere that you need ventilation in the cavity. How is this possible when you fill it.
EnviroBead beads are round and when packed together, air can still circulate around them. If you look at Cavity Wall Insulation (Ventilation). Envirobead complies with the Irish Agrement board standards.

Will water not run through the cavity along the EnviroBead.
Again, the structure of Certainfil Bonded Bead means that water will not penetrate to the cavity. If you look at Cavity Wall Insulation (Water Drainage). Envirobead complies with the Irish Agrement board standards.

What is the u-Value of EnviroBead Plus
0.27 m/k2 for a standard 100 mm cavity.

0.20 m/k2 for a 150mm cavity.

Are Envirobead Irish Agrement Board approved?
Yes, EnviroBead meets with Irish Agrement Board Standards for insulation.

How do you know when the cavity is full?
The bead is injected at the top of the cavity under high pressure. Through gravity and this pressure the bead naturally flows to the bottom of the cavity and continues to fill upwards. The beads will continue to fill any available space. When the cavity is full pressure builds internally and back pressure automatically stops the injection gun. (Just like when you’re filling petrol)

How many holes do you drill?
If you look at Cavity Wall Insulation (Figure1), it shows the number of holes in a 2 storey house. For existing dwellings, the holes are filled with cement mixed carefully with coloured sand to match as closely as possible to the existing mortar, which soon becomes indistinguishable from the original. For new buildings these small holes will be covered completely covered by plasterwork leaving no trace of work done.

At what stage should Certainfil Bonded Bead be installed?
In a new house, Certainfil Bonded Bead should be installed after doors and windows are fitted and the roof complete. In existing houses built pre-1980 with cavity walls, it should be installed immediately.

How do I go about ordering EnviroBead?
Firstly, fill out the survey, and we will get back to you as soon as we can to arrange an installation/survey date.

If you have any other queries or questions then please don’t hesitate to contact us.

Comments are closed.